Articles about NLEX

Check your balance before driving out this weekend
In case you haven't heard, Friday, October 31, 2025, has been declared a special non-working holiday, making this Undas season a long three-day weekend. In anticipation of the holiday rush, Metro Pacific Tollways (MPTC) will be deploying several free
Which RFID are you sticking with?
Motorists traversing through any and all expressways in Luzon now need just one RFID sticker and account. The Department of Transporation and the Toll Regulatory Board have announced that EasyTrip and Autosweep RFIDs are now accepted across all plazas in Luzon, and
The tollway is gearing up for a sustainable future
The Subic-Clark-Tarlac Expressway (SCTEX) is undergoing a series of upgrades, including enhanced CCTV coverage, additional speed cameras, and upgraded computer systems for improved data processing.All in all, these upgrades will cost around P200 million. NLEX Corporation, operator of SCTEX,
These will help manage vehicular traffic and pedestrian crossings in the area
Segment 1 of the NLEX Connector has provided alternate routes to motorists traveling between Caloocan City and Manila City since the elevated tollway opened back in 2023. However, as new routes like these open, traffic flow in the areas can often get
Several NLEX segments were flooded over the recent monsoon rains
The NLEX Corporation has announced that it has run several more flood mitigation and control efforts, following the last three typhoons and monsoon winds that brought about heavy rain and flooding throughout the last two weeks of July.While the tollway operator
As the Marilao Interchange Bridge will be under repair
NOTE: The photo below was taken back in March 2025.The NLEX Corporation has announced that it will waive toll fee collection on the northbound stretch from Balintawak to Meycauayan today, June 22, 2025, from 1am to 12am tomorrow, June 23.During
NLEX Corporation is now investigating the incident
NOTE: The photo above was taken back in March 2025.After almost three months, another overheight truck has crashed into the Marilao Interchange Bridge on NLEX. You may recall the first crash that took place in March earlier this year, which caused
Repairs are scheduled to start on June 7
In case you're heading north for the long weekend, take note: NLEX Corporation has scheduled repairs for the north- and westbound lanes of Marilao Bridge on Saturday, June 7, 2025.Repairs on the northbound road under the bridge will occupy the
Currently, it costs P119 for Class 1 vehicles to use this elevated tollway
Metro Pacific Tollways Corporation has already reached out to the Department of Transportation about the possibility of waiving toll fees on the NLEX Connector during the EDSA rehabilitation project.Earlier this week, the DOTr announced its planned measures to manage traffic during
Remember, EasyTrip RFIDs are free
Metro Pacific Tollways has added a helpful feature to its MPT DriveHub app. Drivers and app users can now schedule their EasyTrip RFID installations directly on DriveHub, with the option to choose their installation location, date, and time. There are certified EasyTrip
A sigh of relief for motorists
The North Luzon Expressway (NLEX) has been a huge pain point for motorists over the past week. Following the incident that compromised the Marilao Interchange Bridge, NLEX Corporation had to close lanes and open a counterflow lane to make way for the
Heads up to everyone going to the Toyota GR Philippine Cup this weekend
As of 7:10am, March 21, three lanes are now passable on each side of the NLEX Marilao Interchange. NLEX Corporation still expects a traffic build-up of around 3.3km between the interchange and light traffic throughout the rest of the
All because of a truck that didn’t fit
For those heading North in the coming days, brace yourselves. After an 18-wheeler truck crashed into the Marilao Interchange Bridge, NLEX Corporation will be conducting repairs on the damaged structure.Because of that, several lanes will be occupied and significantly slow
Drive safely, everyone
Are you due to get a Compulsory Third Party Liability (CTPL) insurance policy? While we hope you never need to use it, CTPL helps protect fellow road users and passengers in the event of a collision or similar types of accidents.Conveniently,
Including repairs to the Marilao River Bridge
According to the NLEX Corporation, its expressway is set to receive a number of maintenance and road improvements throughout 2025. If you've recently traversed NLEX, you might have noticed that certain sections are being refurbished with a fresh layer of asphalt,
This segment is an elevated road connecting Mindanao Avenue and Quirino Highway
NLEX Corporation and Metro Pacific Tollways (MPTC) will collaborate with China Road and Bridge Corporation (CRBC) to construct the latest extension to the North Luzon Expressway. As part of the NLEX-C5 Northlink project, they will work on an elevated road that
Class 1 vehicles traveling in the open system will need to pay P79
Effective March 2, 2025, motorists using the North Luzon Expressway (NLEX) will have to shell out more for toll fees, as the Toll Regulatory Board (TRB) has announced the approval of a toll hike on the expressway.The increase for the NLEX
It was held at the Valenzuela Skate and Paw Park
On February 15, the next generation of skaters shredded all over the brand-new Valenzuela Skate and Paw Park, in a skateboarding competition organized by the Valenzuela City government and the NLEX Corporation.Representatives from the NLEX Corporation, and its operating company
The Tulaoc Overpass Bridge will also be raised by another 1.5 meters
The entire 84km stretch of the North Luzon Expressway (NLEX) is getting a slew of tech upgrades after a P1.4 billion investment in new Automatic License Plate Recognition (ALPR) cameras and more accurate RFID scanners.With news of expressways going completely
It’s expected to help decongest local roads in Valenzuela City
Construction is now underway for the new Lingunan southbound entry ramp of the North Luzon Expressway (NLEX). The 491-meter entry ramp into Barangay Lingunan should help decongest Valenzuela City's local roads upon its scheduled completion in April 2025."We recognize
  • TGP Rating:
    /20

    Starts at ₱

    TGP Rating:
    /20
    Starts at ₱